「松原伸缩门」伸缩门轨道安装类型有哪些要求呢?
1、不锈钢电动伸缩门安装前,首先要现场查抄用户地面是否切合安装条件。
1, stainless steel electric telescopic door before installation, the first site check whether the user's ground is suitable for installation conditions.
1)安装全无轨门时,地面要求每个点都程度、不能有坎坷不服的环境,不然将影响不锈钢电动伸缩门的运行,有轨道不锈钢电动伸缩门可相应减低要求,但误差不能高出0.5公分,不然会影响门排的运行;地面打程度的要领。
1) the installation of the full trackless door, the ground requirements of each point, can not have bumpy not satisfied with the environment, or will affect the operation of stainless steel electric telescopic door, rail stainless steel electric telescopic door can reduce the requirements, but the error can not be higher than 0.5 cm, or it will affect the operation of the door row; The ground hits the essential point of the degree.
2、安装全无轨不锈钢电动伸缩门时,磁铁的安装凭据附后的磁铁预埋要领埋设,不行随意改变安装尺寸,淘汰调试时的评估。
2, the installation of all trackless stainless steel electric telescopic door, the magnet installation credentials attached to the magnet embedded essentials buried, do not arbitrarily change the installation size, eliminate the poor debugging.
3、在埋设地面水泥或轨道时,请将电缆线用绝缘管(PVC管)套好,一同预埋于地下,留意中心不能有接口,制止日后维修贫苦。电线线径要求到达0.75平方以上,埋地线越长线径须加大。
3. When laying cement or track on the ground, please cover the cable with insulation pipe (PVC pipe) and bury it in the ground together. Please pay attention that there is no interface in the center to prevent poor maintenance in the future. Wire diameter is required to reach more than 0.75 square meters, buried wire longer diameter must be increased.
以上是宏创门业为您提供,希望对您有帮助哦~